Structural Alterations
Page under construction
The removal of a load bearing internal walls.
RSJ used to support existing first floor joist.
New door opening formed in an existing wall.

Installation of a cavity tray dpc.
The existing brickwork above a garage and utility room is porous allowing water to enter the garage below, the installation of the tray dpc prevent water from entering the rooms below.